The first AE2 storage network
The quest book ties Charging Quartz (0) to Dark Steel and the LV Autoclave. Reserve the first pump for that autoclave. It converts the pack's GregTech Certus Quartz material to the AE2 crystals needed for the charger. The charger accepts RF through an energy conduit. The first fluix combines charged certus, nether quartz and redstone in a single water block.
The Energy Acceptor (282) leads to the terminal and Crystal Growth Chamber on separate branches. Both meet at the ME Chest (63), itself an ingredient for the ME Drive. This offers a way to replace repeated walks to three physical stores. The ME Controller follows the growth chamber, and the quest book says channels are disabled in this instance. Provide space for the power connection, drive and terminals close to the machine row.
JEI calls for five dark steel plates and two certus quartz plates in the charger. First make twelve dark steel ingots for quest 26, then compress five. Steel and one obsidian each work in the alloy smelter, and quest 23 pays a nickel for twelve obsidian once Molds and the LV Fluid Solidifier are done. Dark Steel itself only needs the Steel quest, so the charger can advance first. A 24-block harvest would leave twelve obsidian banked for the later detection. Certus ore can be bought in lots of 32 for two nickels. Each ore smelts into two GregTech gems. Macerate two gems to dust and compress those for the plates; save other gems for the autoclave, which uses 250 mB water per AE2 certus crystal. The charger quest requires both charged and ordinary AE2 crystals at the same time.